AP 900 GTO Raw PE Curve |
I let Pempro go through 8 cycles of the RA worm to generate the PE curve for the
mount. Seems that the more cycles you let it read the better it can compensate
for the seeing. I learned that although the peak to peak error is 7.5
arc seconds, the error was very smooth and easily guided out. |
After analyzing the raw curve, Pempro then programs the mount to compensate for the
PE. The above graph shows that after correction the mount had a peak to
peak error of 1 arc second. I was kind of skeptical about this data, but
when I started up the autoguider, the guiding was much improved. Earlier
in the evening before running Pempro max guider errors were around 1 pixel, and
afterward the max error was down to .4 pixels. |
AP 900 GTO Corrected PE Curve |